On this page Related

Spare Parts Data Glossary

Plain definitions of spare-parts data terms — supersession, crosswalk, form-fit-function, BOM variants, part status, applicability and more — with where each shows up in your catalog and what to read next.

draft spare-partsglossarysupersessioncrosswalk

The vocabulary of spare-parts data is deceptively familiar. Everyone on the team uses “supersession” and “crosswalk,” but when you look at the actual records, the same word means different things in different systems. This glossary gives each term one plain definition, shows where it appears in your data, and links to the deeper resource where it matters most. Claro treats every one of these terms as a typed, sourced relationship or attribute — not a free-text note someone typed into a spreadsheet five years ago.

TermMeaningWhere it shows up in your dataRead more
SupersessionA manufacturer replaces one part number with anotherPrice-list updates, ERP item-master status field, supplier discontinuation noticesWhat is supersession?
CrosswalkA mapping between two identifier systems (old-to-new, OEM-to-aftermarket, supplier-to-internal)Spreadsheet mapping tables, cross-reference databases, supplier portalsWhat is a crosswalk?
Form, fit, function (FFF)Whether a part has the same shape, mounting and performance as anotherEngineering change orders, equivalence reviews, substitution approvalsForm, fit and function
Exploded viewA diagram showing an assembly’s parts in their spatial relationships, with callout numbersParts books, OEM service manuals, PDF catalogsExploded view, parts list and BOM
Parts listA table of part numbers, descriptions and quantities for one assembly, usually keyed by position numberParts books, ERP BOMs, service documentationExploded view, parts list and BOM
BOM (bill of materials)A structured list of every component in a product; variants include eBOM, mBOM and sBOMERP, PLM, MESExploded view, parts list and BOM
eBOM (engineering BOM)The as-designed structure from engineering; defines what the product isPLM, CAD, PDMExploded view, parts list and BOM
mBOM (manufacturing BOM)The as-built structure; includes process steps, tooling and shop-floor sequencesMES, ERP production moduleExploded view, parts list and BOM
sBOM (service BOM)The as-maintained structure; lists the replaceable parts a field technician needsService manuals, aftermarket catalogsExploded view, parts list and BOM
Position / callout numberThe reference number on an exploded view that links a visual part to its row in the parts listParts-book diagrams, assembly drawingsPosition number and callout number
InterchangeableTwo parts can replace each other with no modification; a strong claim requiring evidenceEngineering approvals, cross-reference databasesInterchangeable vs equivalent vs compatible
EquivalentA part that meets the same specification from a different source, with varying degrees of evidenceSubstitution lists, procurement alternativesInterchangeable vs equivalent vs compatible
CompatibleA part that works alongside another without replacing itCross-sell lists, accessory tables, kit contentsInterchangeable vs equivalent vs compatible
Successor partThe new part number a manufacturer designates as the replacement for a discontinued oneSupersession tables, ERP replacement-item fieldsWhat is supersession?
Last-time buyA window before discontinuation during which the part can still be orderedManufacturer end-of-life notices, procurement alertsLast-time buy and end-of-life
End-of-life (EOL)The point after which a manufacturer no longer produces or supports a partProduct lifecycle notices, item-master statusLast-time buy and end-of-life
NLA (no longer available)A status meaning the part cannot be sourced from the manufacturerERP status fields, distributor availability flagsNLA (no longer available)
Wear partA component expected to degrade in normal use and be replaced on a maintenance scheduleService BOMs, maintenance plans, wear-item listsWear part vs consumable vs kit
ConsumableA material used up in operation (lubricant, filter, wiper blade)Maintenance schedules, consumable reorder listsWear part vs consumable vs kit
KitA pre-packaged set of parts sold and ordered as one unitBOM kit structures, service-kit catalogsWear part vs consumable vs kit
OEM (original equipment manufacturer)The company that designed or brands the finished equipment; usage varies by industryPart-number prefixes, brand fields, equipment nameplatesOEM vs OES vs aftermarket parts
OES (original equipment supplier)The supplier who manufactured a component for the OEM, sometimes selling the same part under its own brandSupplier-origin fields, cross-reference tablesOEM vs OES vs aftermarket parts
AftermarketParts made by third parties as alternatives to the OEM’s parts; evidence for equivalence variesAftermarket catalogs, cross-reference databases, “will-fit” listsOEM vs OES vs aftermarket parts
ApplicabilityWhich machines, models, serial ranges or configurations a part fitsFitment tables, applicability databases, “fits” columnsSpare parts applicability data
Serial rangeThe production serial numbers between which a specific part version appliesApplicability tables, engineering change recordsSpare parts applicability data

Claro

See how Claro handles this in production

This concept is one piece of keeping a catalog trusted. See how Claro resolves identity, enriches missing attributes, and validates every update before it reaches your PIM or ERP.

Learn more